Yes, there are 2 ways:
1) wait to a CQ run and then adds the 2 patches to run afterwards
2) run 1 patch that will fail, and then add to the queue at the same time the second patch and it should pass on the 2nd run.

On Tue, Jul 3, 2018 at 12:26 PM Martin Perina <mperina@redhat.com> wrote:


On Tue, Jul 3, 2018 at 11:03 AM, Ehud Yonasi <eyonasi@redhat.com> wrote:
Suspected patch:

Link to job:

Link to all logs:

Relevant error snippet:
Error: ovirt-engine-wildfly-overlay conflicts with ovirt-engine-wildfly-13.0.0-1.el7.x86_64

​OK​, I thought that I can do stepped approach:

1. Push ovirt-engine-wildfly-13 RPM into the repos
2. Push ovirt-engine-wildfly-overlay-13 RPM, which requires ovirt-engine-wildfly-13, into repos

But it seems that due to serial nature of our CQ it's not possible, so can we pass both patches [1] and [2] though CQ at once?

Thanks

Martin




--
Martin Perina
Associate Manager, Software Engineering
Red Hat Czech s.r.o.