On Wed, Sep 6, 2017 at 9:34 AM, Barak Korren <bkorren@redhat.com> wrote:
On 5 September 2017 at 17:59, Simone Tiraboschi <stirabos@redhat.com> wrote:
>
>
> On Tue, Sep 5, 2017 at 2:00 PM, Dan Kenigsberg <danken@redhat.com> wrote:
>>
>> I believe that this issue is being tackled by
>> https://gerrit.ovirt.org/#/c/81444/
>
>
> No, the issue is on DWH setup side but we merged the related patches there
> almost together.
> Not sure why OST is consuming an older DWH rpm.

OST only uses packages that passed OST before + packages you explicitly add.
The newer DWH setup package probably did not pass OST yet from one
reason or another.

OK, in order to start consuming postgres 9.5 from SCL I had to introduce a patch on ovirt-engine project and another on dwh project and I don't think that we can successfully run the test suite with just one of the two.

Should we simply wait or we have to manually run OST with a list of packages from the two projects in order to have it flagging them as OK?
 

--
Barak Korren
RHV DevOps team , RHCE, RHCi
Red Hat EMEA
redhat.com | TRIED. TESTED. TRUSTED. | redhat.com/trusted