Evgheni,  can you shut down the el6 slaves and power up fedora or el7 instead?

We should have enough powered off to reduce the load.

On Jul 1, 2016 9:50 AM, "Barak Korren" <bkorren@redhat.com> wrote:


בתאריך 1 ביולי 2016 01:54,‏ "Nir Soffer" <nsoffer@redhat.com> כתב:
>
> Hi all,
>
> I noticed 2 bugs in the code setting up a test:
>
> 1. losetup is run with non-existent -D option
> 2. build does not fail although losetup failed
>

It seems the job ran on an el6 slave. My guess would be that '-D' works on newer OSes (afk so can`t check atm). We should probably just drop the el6 slaves at this point. Mock should probably be enough to keep testing engine on el6 for the 3.6 remaining life time.