[ovirt-devel] [VDSM] Coverage reports

Barak Korren bkorren at redhat.com
Thu Dec 3 08:51:24 UTC 2015


On 2 December 2015 at 12:21, Allon Mureinik <amureini at redhat.com> wrote:
> Awesome!
>
> Infra stakeholders - any chance to have this pushed to the devel list once a
> month (or some other reasonable period)?

I see a few possible ways to get this:

1. Run the same code in 'check_merged.sh' followed by some code to
mail the results. With the whole thing surrounded by some conditional
to decide if the time to send a new report had come. (One possibility
is every X merged patches since the last release)

2. Devise some extension the the CI standard to let you specify periodic jobs.

3. Send a YAML patch to create a new stand-alone job. (That,
experience shows, would result in that job being unmaintained)


-- 
Barak Korren
bkorren at redhat.com
RHEV-CI Team



More information about the Devel mailing list