[ovirt-users] Greetings oVirt Users
Joop
jvdwege at xs4all.nl
Fri Apr 6 08:35:03 UTC 2018
On 6-4-2018 02:58, Clint Boggio wrote:
> Environment Rundown:
>
> OVirt 4.2
> 6 CentOS 7.4 Compute Nodes Intel Xeon
> 1 CentOS 7.4 Dedicated Engine Node Intel Xeon
> 1 Datacenter
> 1 Storage Domain
> 1 Cluster
> 10Gig-E iSCSI Storage
> 10Gig-E NFS Export Domain
> 20 VM’s of various OS’s and uses
>
> The current cluster is using the Nehalem architecture.
>
> I’ve got the deploy two new VMs that the current system will not allow me to configure with the Nehalem based cluster, so I’ve got to bump up the architecture of the cluster to accommodate them.
>
> Before i shut down all the current VMs to upgrade the cluster, I have some questions about the effect this is going to have on the environment.
>
> 1. Will all of the current VM’s use the legacy processor architecture or will I have to change them ?
They can keep the legacy architecture.
The level is determined by the server with the lowest specs qua
architecture but since it is a cluster property you can add 1 or 2 new
servers in a new cluster which you could use to run the new VMs.
So if all your servers are Nehalem than you'll need at least one new server.
>
> 2. Can I elevate the cluster processor functionality higher than the underlying hardware architecture ?
No
>
> 3. In regards to the new cluster processor, will all of the processor architectures below the one I choose be an option for the existing and future VMs ?
Yes.
>
> I apologize for the long post and I hope that I haven’t left out any vital information.
>
Joop