[JIRA] (OVIRT-2714) Increase limits on concurrent https://jenkins.ovirt.org/job/ovirt-system-tests_manual/ jobs

[ https://ovirt-jira.atlassian.net/browse/OVIRT-2714?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=39574#comment-39574 ] Eyal Edri commented on OVIRT-2714: ---------------------------------- [~eyonasi@redhat.com] sent [https://gerrit.ovirt.org/#/c/101876/|https://gerrit.ovirt.org/#/c/101876] to move the manual job to containers, so it will have more slots to run tests. It means that OST runs might take 20% longer to run but will have much more parallel runs available from what we had so far.
Increase limits on concurrent https://jenkins.ovirt.org/job/ovirt-system-tests_manual/ jobs -------------------------------------------------------------------------------------------
Key: OVIRT-2714 URL: https://ovirt-jira.atlassian.net/browse/OVIRT-2714 Project: oVirt - virtualization made easy Issue Type: Task Reporter: Michal Skrivanek Assignee: infra
This one is about manual OST runs cloned from OVIRT-2704 --- We started to use this job to build artifacts for running OST. Looks like this job is limited to one concurrent job, which make it less useful than it could be. If we don't make it easy to run OST, people will not run it, and the change queue will break. Please change the limit to use the same limit used for regular builds. We seem to be able to create more then 10 concurrent builds by uploading patches to gerrit. The manual runner should this as well. Nir
-- This message was sent by Atlassian Jira (v1001.0.0-SNAPSHOT#100105)
participants (1)
-
Eyal Edri (oVirt JIRA)