[
https://ovirt-jira.atlassian.net/browse/OVIRT-1223?page=com.atlassian.jir...
]
eyal edri [Administrator] updated OVIRT-1223:
---------------------------------------------
Resolution: Won't Do
Status: Done (was: To Do)
As discussed, please add these tests to the OST suite.
If we'll find out that they are taking too long, we'll introduce a nightly OST
suite if needed.
Nightly/bare metal vdsm check-merged jobs
-----------------------------------------
Key: OVIRT-1223
URL:
https://ovirt-jira.atlassian.net/browse/OVIRT-1223
Project: oVirt - virtualization made easy
Issue Type: By-EMAIL
Reporter: Leon Goldberg
Assignee: infra
Hey,
We're trying to come up with a solution to our lengthy check-merged
jobs, that are about to become even lengthier now when we've
discovered we're missing a permutation to our network tests.
check-merged currently takes roughly 50 minutes to run to completion,
with the network tests taking roughly 30 minutes; with the additional
permutation check-merged will run for more than an hour.
We thought of 2 possible solutions:
1) Only run the additional permutation once a day (e.g. introduce a
nightly job).
2) Run check-merged on bare metal -- network tests take roughly 1/3 of
the time on bare metal.
Somehow closing the gap to bare metal would also of course be nice.
We'd love your input.
Thanks,
Leon
--
This message was sent by Atlassian JIRA
(v1000.824.3#100035)