[QE][ACTION REQUIRED] oVirt 3.6.0 status

Hi, Release criteria discussion started on 2014-10-22 and should have ended last week as per current release process [1]. Since oVirt sync meeting wasn't held last week, it has been postponed to today 2014-11-19. Current options are: 1) keeping the same release criteria we had for 3.5 [2] 2) review the proposed changes [3] and prepare new release criteria for 3.6 Release management for 3.6.0 has been created [4] The key milestones for this release must be scheduled: Key Milestones Release criteria discussion start: 2014-10-22 Release criteria ready: 2014-11-19 Feature freeze: 60 Days before release First Test Day: 45 days before release Release Candidate: 30 days before release Release: 6 months after oVirt 3.5.0 release External Project Schedules Fedora 21: 2014-12-09 Fedora 22: 2015-XX-XX GlusterFS 3.7: 2015-04-29 OpenStack Kilo: 2015-04-30 Two different proposals have been made about above scheduling [5]: 1) extend the cycle to 10 months for allowing to include a large feature set 2) reduce the cycle to less than 6 months and split features over 3.6 and 3.7 Feature proposed for 3.6.0 must now be collected in the 3.6 google doc [9] and reviewed by maintainers. A tracker bug for 3.6.0 has been created [6] and currently shows no blockers. There are 412 bugs [7] targeted to 3.6.0. Excluding node and documentation bugs we have 392 bugs [8] targeted to 3.6.0. [1] http://www.ovirt.org/Release_process [2] http://www.ovirt.org/OVirt_3.5_release-management#Release_Criteria [3] http://lists.ovirt.org/pipermail/devel/2014-September/008695.html [4] http://www.ovirt.org/OVirt_3.6_Release_Management [5] http://lists.ovirt.org/pipermail/users/2014-November/028875.html [6] https://bugzilla.redhat.com/show_bug.cgi?id=1155425 [7] http://goo.gl/zwkF3r [8] http://goo.gl/ZbUiMc [9] http://goo.gl/9X3G49 -- Sandro Bonazzola Better technology. Faster innovation. Powered by community collaboration. See how it works at redhat.com
participants (1)
-
Sandro Bonazzola