[Engine-devel] ATTN: Project Maintainers: Code Freeze/Branch/Beta Build deadlines
Mike Burns
mburns at redhat.com
Thu Jan 10 01:07:58 UTC 2013
(Sorry for cross posting, trying to ensure I hit all the relevant
maintainers)
If you are the primary maintainer of a sub-project in oVirt, this
message is for you.
At the Weekly oVirt Meeting, the final devel freeze and beta dates were
decided.
Freeze: 2013-01-14
Beta Post: 2013-01-15
Action items:
* You project should create a new branch in gerrit for the release
* You should create a formal build of your project for the beta post
* Get the formal build of your project into the hands of someone who can
post it [1][2]
These should all be done by EOD on 2013-01-14 (with the exception of
ovirt-node-iso) [3]
Packages that this impacts:
* mom
* otopi
* ovirt-engine
* ovirt-engine-cli
* ovirt-engine-sdk
* ovirt-guest-agent
* ovirt-host-deploy
* ovirt-image-uploader
* ovirt-iso-uploader
* ovirt-log-collector
* ovirt-node
* ovirt-node-iso
* vdsm
Thanks
Mike Burns
[1] This is only necessary if the package is *not* already in fedora
repos (must be in actual fedora repos, not just updates-testing or koji)
[2] Communicate with mburns, mgoldboi, oschreib to deliver the packages
[3] ovirt-node-iso requires some of the other packages to be available
prior to creating the image. This image will be created either on
2013-01-14 or 2013-01-15 and posted along with the rest of the Beta.
More information about the Engine-devel
mailing list