[JIRA] (OVIRT-627) Implement Zuul as pre-merge action to run experimental flows
eyal edri [Administrator] (oVirt JIRA)
jira at ovirt-jira.atlassian.net
Thu Dec 1 08:51:02 UTC 2016
[ https://ovirt-jira.atlassian.net/browse/OVIRT-627?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
eyal edri [Administrator] reassigned OVIRT-627:
-----------------------------------------------
Assignee: bkorren (was: infra)
I guess this is the second step after we see Zuul integration works.
I think the 1st thing we should do is create some sort of design diagram of how we want the flow to work and what input/output/triggers it should have.
> Implement Zuul as pre-merge action to run experimental flows
> -------------------------------------------------------------
>
> Key: OVIRT-627
> URL: https://ovirt-jira.atlassian.net/browse/OVIRT-627
> Project: oVirt - virtualization made easy
> Issue Type: Bug
> Reporter: eyal edri [Administrator]
> Assignee: bkorren
>
> Today, we can test a patch per project on each of the ovirt versions using experimanal flow
> i,e:
> run build_artifacts with a patch -> deploy to experimental -> run test job
> this is problematic since it actually deploys the build with the patch to the experimental repo which should only contain built pkg that are merged.
> We need to either close the flow or add param to the build artifacts that says 'create temp repo/test repo' so the built rpm won't be part of the official tested repo and the link to latest_tested won't be updated if this option is triggered.
--
This message was sent by Atlassian JIRA
(v1000.606.0#100023)
More information about the Infra
mailing list