[ovirt-users] Power Management with UPS Network UPS Tools (NUT)
Eli Mesika
emesika at redhat.com
Wed Aug 20 07:31:25 UTC 2014
Hi
oVirt 3.5 install hypervisors with the fence-agents package which has a certain list of supported power management (PM) cards
in oVirt 3.5 if you want to add custom PM card in addition to the supported PM cards you should follow http://www.ovirt.org/Custom_Fencing
Basically once you write your own script and install it on each host where fence-agents package is installed and modify oVirt configuration as described in the wiki, you should be able to see your custom agent in the list and use it.
Please let me know if you need any further assist with that
CCing also Marec G who is in charge of the fence-agents package
Thanks
Eli
----- Original Message -----
> From: "OvirtAndKvm" <oVirt at goproject.info>
> To: users at ovirt.org
> Sent: Wednesday, August 20, 2014 3:04:22 AM
> Subject: [ovirt-users] Power Management with UPS Network UPS Tools (NUT)
>
> I would like to implement Power Management using an Eton E5 UPS, if this is
> not possible then I would like to know what UPS systems can be easily used
> with oVirt.
>
> Can someone point me to information on how to configure the UPS, CentOS 6.5
> (preferably), and oVirt to use the UPS system, so that I could purchase,
> install and implement the UPS.
>
> If anyone has information regarding UPS, please reply to this email with
> links to the information.
>
> Can oVirt use "Network UPS Tools (NUT)" for Power Management ? If so, is
> there any documentation on this subject that you could provide links to,
> please.
>
> http://www.ovirt.org/Features/HostPowerManagementPolicy
>
> http://www.howtoforge.com/network-ups-tools-nut-for-usb-upss-on-centos-5.5
> http://www.networkupstools.org/docs/user-manual.chunked/ar01s05.html
> http://www.networkupstools.org/features.html
> http://www.ovirt.org/Automatic_Fencing
>
> So far the most common statement I have found is "Ignore the warning about
> power management", but this is not what I want to do.
> http://www.r11networks.com/2013/04/ovirt-installation-guide/
>
> http://www.ovirt.org/DraftAdministrationGuide
>
>
>
> http://www.ovirt.org/DraftAdministrationGuide#Host_Power_Management_settings_explained
>
> Choose one of the following:
>
> * apc - APC MasterSwitch network power switch. Not for use with APC 5.x
> power switch devices.
> * apc_snmp - Use with APC 5.x power switch devices.
> * bladecenter - IBM Bladecentre Remote Supervisor Adapter.
> * cisco_ucs - Cisco Unified Computing System.
> * drac5 - Dell Remote Access Controller for Dell computers.
> * drac7 - Dell Remote Access Controller for Dell computers.
> * eps - ePowerSwitch 8M+ network power switch.
> * hpblade - HP BladeSystem.
> * ilo , ilo2 , ilo3 , ilo4 - HP Integrated Lights-Out.
> * ipmilan - Intelligent Platform Management Interface and Sun Integrated
> Lights Out Management devices.
> * rsa - IBM Remote Supervisor Adaptor.
> * rsb - Fujitsu-Siemens RSB management interface.
> * wti - WTI Network PowerSwitch.
>
> Configuring Host Power Management Settings
>
>
> Summary
>
> Configure your host power management device settings to perform host
> life-cycle operations (stop, start, restart) from the Administration Portal.
>
> It is necessary to configure host power management in order to utilize host
> high availability and virtual machine high availability.
>
>
>
>
> _______________________________________________
> Users mailing list
> Users at ovirt.org
> http://lists.ovirt.org/mailman/listinfo/users
>
More information about the Users
mailing list