Il giorno lun 12 nov 2018 alle ore 11:07 Martin Perina <mperina(a)redhat.com>
ha scritto:
On Mon, Nov 12, 2018 at 10:31 AM Sandro Bonazzola <sbonazzo(a)redhat.com>
wrote:
> Hi,
> we'd like to be ready for releasing a first oVirt 4.3.0 beta on November
> 26th.
> In order to do that, we need all packages to be ready for it by Sunday
> November 25th.
>
I'm not 100% percent sure, that PG10 upgrade will be merged and all
important flows tested till that date (especially various upgrade flows) ...
This sounds like a valid reason for blocking beta release.
Maintainers: please ensure your packages can be installed are feature
> complete with regards to ovirt-4.3.0 target and passed CI testing.
> An integration testing on the master nightly will be done manually on
> Friday November 23rd to ensure basic functionalities are working as
> expected.
> Please note we don't have any guarantee that CentOS 7.6 will be out by
> that time.
>
IMO it doesn't make sense, we should wait for CentOS 7.6 and we should
require it for 4.3 from beginning
Are we relying on any specific CentOS 7.6 feature we need in 4.3?
> Please check oVirt 4.3 Beta release criteria[1] and help getting ready
> for it.
>
> If you have something that should block the beta release please raise the
> issue as soon as possible.
>
> Thanks,
>
> [1]
>
https://www.ovirt.org/develop/release-management/releases/4.3/release-man...
>
>
> --
>
> SANDRO BONAZZOLA
>
> MANAGER, SOFTWARE ENGINEERING, EMEA R&D RHV
>
> Red Hat EMEA <
https://www.redhat.com/>
>
> sbonazzo(a)redhat.com
> <
https://red.ht/sig>
>
--
Martin Perina
Associate Manager, Software Engineering
Red Hat Czech s.r.o.
--
SANDRO BONAZZOLA
MANAGER, SOFTWARE ENGINEERING, EMEA R&D RHV
Red Hat EMEA <
https://www.redhat.com/>
sbonazzo(a)redhat.com
<
https://red.ht/sig>