Hi,
This mail is to provide the current status of CQ and allow people to review
status before and after the weekend.
Please refer to below colour map for further information on the meaning of
the colours.
*CQ-4.2*: GREEN (#2)
We have no current failures.
Last failed job was for ovirt-provider-ovn due to build-artiacts job on Feb
6. the issue was resolved and ovirt-provider passed the same day.
*CQ-Master:* GREEN (#1)
There are no current issues in master CQ
During the week we had 3 issues:
1. packages were missing from several repose. this was reposlved by a patch
submitted by Galit on Monday.
2. we had a missing ovirt-web-ui as the package that we were testing was
too old. as the project had no V2 configuration it was manually added. Greg
however, added the project to CQ and a new package was already built and
passed CQ.
3. Regression in test add_direct_lun was causing ovirt-engine project to
fail.
Patch causing failure:
https://gerrit.ovirt.org/#/c/97075/ - core: disallow
creating disks of size 0
Patch fixing regression:
https://gerrit.ovirt.org/#/c/97622/ - core: skip
disk size validation for lun disks
The patch passed CQ and we have package:
https://resources.ovirt.org/pub/ovirt-master-snapshot/rpm/el7/noarch/ovir...
4.3.0.5-0.0.master.20190207124642.git415c7e8.el7.noarch.rpm
Current running jobs for 4.2 [1] and master [2] can be found here:
[1]
http://jenkins.ovirt.org/view/Change%20queue%20jobs/job/ovirt-4.2_change-...
[2]
http://jenkins.ovirt.org/view/Change%20queue%20jobs/job/ovirt-master_chan...
Happy week!
Dafna
-------------------------------------------------------------------------------------------------------------------
COLOUR MAP
Green = job has been passing successfully
** green for more than 3 days may suggest we need a review of our test
coverage
1.
1-3 days GREEN (#1)
2.
4-7 days GREEN (#2)
3.
Over 7 days GREEN (#3)
Yellow = intermittent failures for different projects but no lasting or
current regressions
** intermittent would be a healthy project as we expect a number of
failures during the week
** I will not report any of the solved failures or regressions.
1.
Solved job failures YELLOW (#1)
2.
Solved regressions YELLOW (#2)
Red = job has been failing
** Active Failures. The colour will change based on the amount of time the
project/s has been broken. Only active regressions would be reported.
1.
1-3 days RED (#1)
2.
4-7 days RED (#2)
3.
Over 7 days RED (#3)