
This mail is to provide the current status of CQ and allow people to review status before and after the weekend. Please refer to below colour map for further information on the meaning of the colours. *CQ-4.2*: GREEN (#3) Last failure was on 05-06 for project ovirt-ansible-cluster-upgrade due to failure in test 002_bootstrap.add_master_storage_domain. The fix was created and merged *CQ-4.3*: GREEN (#1) There were two main failures this week. 1. vdsm was failing due to the sos change which was causing metrics tests to fail as it was using vdsm sos plugin and that is no longer available. this was fix by mperina: https://gerrit.ovirt.org/100716 https://gerrit.ovirt.org/100809 2. there was a general failure due to packages. two patches were merged to fix the issue: https://gerrit.ovirt.org/#/c/100764/ https://gerrit.ovirt.org/#/c/100691/ *CQ-Master:* GREEN (#1) Master was failing on the same issues as in 4.3 which are now fixed Current running jobs for 4.2 [1], 4.3 [2] and master [3] can be found here: [1] http://jenkins.ovirt.org/view/Change%20queue%20jobs/job/ovirt-4.2_change-que... [2] https://jenkins.ovirt.org/view/Change%20queue%20jobs/job/ovirt-4.3_change-qu... [3] http://jenkins.ovirt.org/view/Change%20queue%20jobs/job/ovirt-master_change-... Happy week! Dafna ------------------------------------------------------------------------------------------------------------------- COLOUR MAP Green = job has been passing successfully ** green for more than 3 days may suggest we need a review of our test coverage 1. 1-3 days GREEN (#1) 2. 4-7 days GREEN (#2) 3. Over 7 days GREEN (#3) Yellow = intermittent failures for different projects but no lasting or current regressions ** intermittent would be a healthy project as we expect a number of failures during the week ** I will not report any of the solved failures or regressions. 1. Solved job failures YELLOW (#1) 2. Solved regressions YELLOW (#2) Red = job has been failing ** Active Failures. The colour will change based on the amount of time the project/s has been broken. Only active regressions would be reported. 1. 1-3 days RED (#1) 2. 4-7 days RED (#2) 3. Over 7 days RED (#3)