Evgheni, can you shut down the el6 slaves and power up fedora or el7
instead?
We should have enough powered off to reduce the load.
On Jul 1, 2016 9:50 AM, "Barak Korren" <bkorren(a)redhat.com> wrote:
בתאריך 1 ביולי 2016 01:54, "Nir Soffer" <nsoffer(a)redhat.com> כתב:
>
> Hi all,
>
> I noticed 2 bugs in the code setting up a test:
>
> 1. losetup is run with non-existent -D option
> 2. build does not fail although losetup failed
>
It seems the job ran on an el6 slave. My guess would be that '-D' works on
newer OSes (afk so can`t check atm). We should probably just drop the el6
slaves at this point. Mock should probably be enough to keep testing engine
on el6 for the 3.6 remaining life time.
_______________________________________________
Infra mailing list
Infra(a)ovirt.org
http://lists.ovirt.org/mailman/listinfo/infra