[ovirt-devel] [ovirt-users] [QE][ACTION REQUIRED] oVirt 3.6.0 status
Robert Story
rstory at tislabs.com
Thu Dec 4 01:24:42 UTC 2014
On Wed, 03 Dec 2014 10:37:19 +0100 Sandro wrote:
SB> Two different proposals have been made about above scheduling [3]:
SB> 1) extend the cycle to 10 months for allowing to include a large
SB> feature set 2) reduce the cycle to less than 6 months and split
SB> features over 3.6 and 3.7
I'd prefer a six-month cycle, so that the smaller features and enhancements
come more quickly.
Robert
--
Senior Software Engineer @ Parsons
-------------- next part --------------
A non-text attachment was scrubbed...
Name: signature.asc
Type: application/pgp-signature
Size: 181 bytes
Desc: not available
URL: <http://lists.ovirt.org/pipermail/devel/attachments/20141203/f4038042/attachment-0001.sig>
More information about the Devel
mailing list