[ovirt-devel] [QE][ACTION REQUIRED] oVirt 3.6.0 status
Sandro Bonazzola
sbonazzo at redhat.com
Wed Nov 12 10:33:03 UTC 2014
Hi,
Release criteria discussion started on 2014-10-22 and should end today as per current release process [1].
Current options are:
1) keeping the same release criteria we had for 3.5 [2]
2) review the proposed changes [3] and prepare new release criteria for 3.6
Release management for 3.6.0 has been created [4]
The key milestones for this release must be scheduled:
Key Milestones
Release criteria discussion start: 2014-10-22
Release criteria ready: 2014-11-12
Feature freeze: 60 Days before release
First Test Day: 45 days before release
Release Candidate: 30 days before release
Release: 6 months after oVirt 3.5.0 release
Two different proposals have been made about above scheduling [5]:
1) extend the cycle to 10 months for allowing to include a large feature set
2) reduce the cycle to less than 6 months and split features over 3.6 and 3.7
Feature proposed for 3.6.0 must now be collected in the 3.6 google doc [9]
and reviewed by maintainers.
A tracker bug for 3.6.0 has been created [6] and currently shows no blockers.
There are 399 bugs [7] targeted to 3.6.0.
Excluding node and documentation bugs we have 379 bugs [8] targeted to 3.6.0.
[1] http://www.ovirt.org/Release_process
[2] http://www.ovirt.org/OVirt_3.5_release-management#Release_Criteria
[3] http://lists.ovirt.org/pipermail/devel/2014-September/008695.html
[4] http://www.ovirt.org/OVirt_3.6_Release_Management
[5] http://lists.ovirt.org/pipermail/users/2014-November/028875.html
[6] https://bugzilla.redhat.com/show_bug.cgi?id=1155425
[7] http://goo.gl/zwkF3r
[8] http://goo.gl/ZbUiMc
[9] http://goo.gl/9X3G49
--
Sandro Bonazzola
Better technology. Faster innovation. Powered by community collaboration.
See how it works at redhat.com
More information about the Devel
mailing list