
On Wed, Sep 6, 2017 at 9:34 AM, Barak Korren <bkorren@redhat.com> wrote:
On 5 September 2017 at 17:59, Simone Tiraboschi <stirabos@redhat.com> wrote:
On Tue, Sep 5, 2017 at 2:00 PM, Dan Kenigsberg <danken@redhat.com>
I believe that this issue is being tackled by https://gerrit.ovirt.org/#/c/81444/
No, the issue is on DWH setup side but we merged the related patches
wrote: there
almost together. Not sure why OST is consuming an older DWH rpm.
OST only uses packages that passed OST before + packages you explicitly add. The newer DWH setup package probably did not pass OST yet from one reason or another.
OK, in order to start consuming postgres 9.5 from SCL I had to introduce a patch on ovirt-engine project and another on dwh project and I don't think that we can successfully run the test suite with just one of the two. Should we simply wait or we have to manually run OST with a list of packages from the two projects in order to have it flagging them as OK?
-- Barak Korren RHV DevOps team , RHCE, RHCi Red Hat EMEA redhat.com | TRIED. TESTED. TRUSTED. | redhat.com/trusted