[
https://ovirt-jira.atlassian.net/browse/OVIRT-2714?page=com.atlassian.jir...
]
Eyal Edri commented on OVIRT-2714:
----------------------------------
[~eyonasi(a)redhat.com] sent
[
https://gerrit.ovirt.org/#/c/101876/|https://gerrit.ovirt.org/#/c/101876] to move the
manual job to containers, so it will have more slots to run tests.
It means that OST runs might take 20% longer to run but will have much more parallel runs
available from what we had so far.
Increase limits on concurrent
https://jenkins.ovirt.org/job/ovirt-system-tests_manual/ jobs
-------------------------------------------------------------------------------------------
Key: OVIRT-2714
URL:
https://ovirt-jira.atlassian.net/browse/OVIRT-2714
Project: oVirt - virtualization made easy
Issue Type: Task
Reporter: Michal Skrivanek
Assignee: infra
This one is about manual OST runs
cloned from OVIRT-2704
---
We started to use this job to build artifacts for running OST.
Looks like this job is limited to one concurrent job, which make it less
useful than
it could be.
If we don't make it easy to run OST, people will not run it, and the change
queue
will break.
Please change the limit to use the same limit used for regular builds. We
seem to be
able to create more then 10 concurrent builds by uploading patches to
gerrit. The manual
runner should this as well.
Nir
--
This message was sent by Atlassian Jira
(v1001.0.0-SNAPSHOT#100105)